This story is from the CurrentWire archive. Coverage details reflect the last time it was updated.
Best Cyclotron Systems Announces Successful Factory Acceptance Testing of 70-MeV High-Current Cyclotron for Delivery to Taiwan
OTTAWA, Ontario — Best Cyclotron Systems (BCS), a TeamBest Global (TBG) company with locations in Ottawa and Vancouver, Canada, and Knoxville, Tennessee, USA, is pleased to announce the successful completion in July of Factory Acceptance Tests (FAT) for the Best 70-MeV high-current proton cyclotron (B-70), a state-of-the-art accelerator designed, developed, and manufactured by TeamBest engineers […]
Financial Post
Published by CurrentWire · First coverage
Compiled by CurrentWire News Desk
Summary based on reporting from Financial Post.

Automated coverage analysis
Generated automatically from the coverage listed on this page. CurrentWire adds no editorial claims.
Coverage
1 publication is covering this story.
How CurrentWire compiled this story
Financial Post (financialpost.com), a Tier B publisher, filed this report on . CurrentWire published this page 26 minutes later, on .
Filed under World · Canada · News. Topics extracted from this report, with other live CurrentWire stories mentioning each: Canada (27), Ottawa (3), Vancouver (1), Ontario (5), Cyclotron Systems (none), Successful Factory Acceptance Testing (none), High-Current Cyclotron (none).
CurrentWire is a news discovery platform. This page summarizes and links to original reporting; full articles, imagery and copyright remain with the publishers listed above.